Kitchen Renovation in Malvern East

A kitchen renovation in Malvern East usually starts with two questions: what will it really cost, and who should run it, a kitchen company or an architect? Here is the honest version of both answers, from a practice that has been giving them for 35+ years.

Image —
Edwardian kitchen zone,
Malvern East
Architect, not kitchen company

The kitchen company sells you a kitchen. An architect redesigns the part of the house the kitchen lives in: where the light comes from, how the room meets the garden, what wall can move, and whether the money is better spent on joinery or on space. In Malvern East's Edwardian and interwar homes, where the kitchen is usually the darkest room in the plan, that difference is the whole game.

35+
Years
400+
Projects
59+
Heritage Approvals
Cost

What architect-led kitchen
and interior work costs

Across BY Projects' delivered work, kitchen and interior projects have ranged from approximately $230,000–320,000, typically covering the redesign of the kitchen zone and its surrounding spaces, not just cabinetry swapped in place. These are portfolio examples rather than Malvern East price guides; scope and the house drive the real number, and the feasibility session gives you one for your project. Fees are fixed and agreed before design starts.

Image —
redesigned kitchen zone,
joinery detail
Image —
interwar home,
Stonnington streetscape
Permits

The permit question, answered
from the council's own rules

Most kitchen renovations in Stonnington need no heritage permission at all: the council states that unless your Heritage Overlay schedule says otherwise, a planning permit is generally not required for internal alterations. The rules bite when the project reaches the outside, new windows or doors, services visible from the street, or an extension to gain kitchen space, and your property's grading (Significant, Contributory or Non-contributory) sets how much can change. Stonnington also runs a faster ten-day assessment stream for eligible heritage applications. We confirm exactly which side of those lines your project sits on before design begins, so nothing is drawn that cannot be built.

Proof

We do this work inside
protected houses

Our Alexander Street project in Box Hill reworked a protected Victorian's kitchen within its original walls (HO242), planning approval in six months, character intact. Closer to home, the practice completed a whole-house renovation of a mid-century villa unit on Harvey Street, Malvern in 2025, and an Edwardian renovation in Malvern the same year. Kitchens are where those projects are won or lost, and where our building-science grounding (Barbara lectured in it for around a decade) earns its keep: ventilation, daylight and thermal comfort designed in, not hoped for.

Image —
Alexander Street
heritage kitchen
Want a real number for your kitchen, not a brochure range?

Get one drawn for your house.

Book a Feasibility Session
Common Questions

Malvern East kitchen questions,
answered honestly

How much does a kitchen renovation cost in Malvern East?

Cabinet-swap renovations run far less than architectural ones, and they buy less: our kitchen and interior projects have ranged from approximately $230,000–320,000 because they redesign the space, not just the cupboards. Portfolio examples, not a local price guide; the feasibility session prices your actual project.

Do I need a council permit for a kitchen renovation?

Usually not for the interior work: Stonnington's own rules say a planning permit is generally not required for internal alterations unless your overlay schedule specifies it. External changes and extensions do need one. We check your property's exact position first.

How long does an architect-led kitchen project take?

Design and documentation typically run a few months; where a permit is needed, Stonnington offers a faster ten-day stream for eligible heritage applications, and our Alexander Street approval took six months end to end. The feasibility session maps your realistic timeline.

Why use an architect instead of a kitchen company?

Because the expensive mistakes in kitchen projects are spatial, not cosmetic: light, circulation, structure and services. An architect solves those once, in drawings, before money is committed to joinery.

Local Knowledge

Useful Stonnington
resources

Heritage guidelines and overlays at Stonnington

Permit triggers, gradings and the Heritage Design Guidelines.

Request pre-application advice

The council's formal pathway before lodgement.

Victorian Heritage Database

Check a property's grading.

The Process

How it runs

A full one-hour feasibility session with registered architect Barbara Yerondais FRAIA looks at your kitchen in the context of the whole plan: what the room could become, what the house allows, what the budget honestly buys. You leave with a drawn concept, yours to keep, no obligation. If we proceed, the fee is fixed from the outset and the design carries through joinery detail, services and builder selection.

Schedule a Feasibility Session